翻訳と辞書
Words near each other
・ New Cult Awareness Network
・ New Culture Movement
・ New Cumberland
・ New Cumberland Defense Depot
・ New Cumberland, Nova Scotia
・ New Cumberland, Ohio
・ New Cumberland, Pennsylvania
・ New Cumberland, West Virginia
・ New Cumnock
・ New Cumnock railway station
・ New Current
・ New Cush
・ New Cut
・ New Cut Landfill
・ New Cut Lane Halt railway station
New Cut, Bristol
・ New Cutie Honey
・ New Cutting Edge
・ New Cuyama Airport
・ New Cuyama, California
・ New Cybernetics (Gordon Pask)
・ New Cyprus Party
・ New daily persistent headache
・ New Dance Group
・ New Danish cuisine
・ New Danube
・ New Danville, Pennsylvania
・ New Darnytskyi Bridge
・ New Data Seal
・ New Dawn


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

New Cut, Bristol : ウィキペディア英語版
New Cut, Bristol

The New Cut is an artificial waterway which was constructed between 1804 and 1809 to divert the tidal river Avon through south and east Bristol, England. This was part of the process of constructing Bristol's Floating Harbour, under the supervision of engineer William Jessop. The cut runs from Totterdown Basin at the eastern end of St Phillip's Marsh, near Temple Meads, to the Underfall sluices at Rownham in Hotwells.
The length of the cut is approximately and with the addition of short sections of the original course of the river Avon at either end, connecting Netham weir and Totterdown basin, and the Underfall sluices to the mouth of the Entrance lock at Cumberland Basin, the overall watercourse length is . No ships have navigated the cut on a regular basis since the 1930s, but it is still possible for boats to proceed as far as Netham weir with care.
==Construction==

The Bristol Docks Company was formed to construct the Floating Harbour following the passage of an Act of Parliament in 1803, sponsored by the City Corporation and the Merchant Venturers. The engineer William Jessop had originally proposed a smaller scheme, which would have involved a shorter cut from Prince Street, near the city centre, to Rownham. However this would have meant that ship owners could have avoided using the new Floating Harbour and the scheme was amended to include a greater area of the river Avon, thus necessitating the longer cut which is in existence today.
Work commenced on the construction on 1 May 1804 at 5am at a ceremony conducted by the directors of the Bristol Docks Company.〔 Excavation was made through the predominant Redcliffe Sandstone, a Triassic rock that can be seen in cuttings all along the New Cut.〔
〕 It has been proposed that the labour force included French prisoners of war, but there is apparently no evidence confirming this.
A report to the company stated that in the first year of excavation of earth and rock had been removed at a cost of £120,138 12s. 1d. The initial estimates of £300,000 for the whole docks scheme proved insufficient and further acts had to be passed to raise the capital to £600,000. The Avon was diverted into the New Cut in January 1809 and on 2 April the first ships passed up the cut and entered the harbour at the Bathurst Basin.
On 1 May 1809 the docks project was certified as complete and a celebratory dinner was held on Spike Island for a thousand of the navvies, navigational engineers who had worked on the construction, at which "two oxen, roasted whole, a proportionate weight of potatoes, and six hundredweight of plum pudding" were consumed, along with a gallon of strong beer for each man. When the beer ran out a mass brawl between English and Irish labourers turned into a riot which had to be suppressed by the press gang.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「New Cut, Bristol」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.